Rubber Rings Manufacturer summarized seven requirements for PE pipe installation.

1. Before connecting pipes, please handle pipes and fittings. Auxiliary equipment shall be inspected according to design requirements and visual inspection shall be carried out at the construction site.

2. According to the different interface types, corresponding special heating tools should be used, and open flames should not be used to heat pipes and accessories.

3. For pipes connected by welding, pipes and fittings of the same grade should be used. For similar performance, it must be tested before being qualified.

4. Before connecting, the pipes and fittings should be placed on the construction site for a period of time to keep the temperature of the pipes and fittings consistent.

5. When connecting under cold climate and high wind conditions, protective measures or adjustment of the connection process should be taken.

6. When connecting the pipeline, the end of the pipeline should be kept clean, and the opening of the pipeline should be temporarily blocked at the end of each work to prevent debris from entering the pipeline.

7. Visual inspection should be carried out after the pipeline is connected, and the unqualified ones should be reworked immediately.

Through the above introduction, Pe Gasket Manufacturers hopes that you can simply refer to the content of this article in future use.